storage

Water Storage Tank Repainting

October 12, 2018

The Morningside elevated water storage tank has been providing water service to Sioux City residents and businesses since 1958. DGR Engineering evaluated the condition of the existing coatings to determine an appropriate maintenance strategy. The selected strategy is expected to provide excellent corrosion protection to the structure for 25-30 years into the future.

The residential location of the tank caused the City to include a containment shroud as a project requirement. The shroud successfully prevented blasting debris and paint from drifting off-site to neighboring properties.

In just under four months, the tank was drained, sandblasted, and nearly 1,900 gallons of paint applied to over 100,000 square feet of surface area.  The tank was then returned to service.

Ground Storage Reservoir

October 12, 2018

Construction of a bolted steel glass lined tank, foundations, and miscellaneous appurtenant work.  Nominal size is 300,000 gallons, 36′ diameter, 38′ high.

The ground storage reservoir is a critical component of the water treatment process, allowing flow equalization between the filtration process and the softening system.