This project consisted of installing 8” water main beginning approximately 1,700 feet southwest of the Great Bear entrance road and continuing 3,700 feet to the northeast. This project included water main installation, asphalt removal and replacement, and site restoration and grading. Also included in this project was the grading and paving for a turn lane approximately 600 feet long on Rice Street for the proposed TJN site.
DGR worked with college staff to improve the surface drainage surrounding the East Campus apartments as well as enhancing the Campus Green Space on this project.
The East Campus apartment portion of the project included storm sewer upgrades, pedestrian facilities and enhanced grading around the existing buildings to improve surface water drainage.
One of the college’s goals with this project was to remove parking from the heart of the campus, the Campus Green Space. This was accomplished by reconfiguring the parking, vehicular access points to East Campus and Covenant Hall and by converting the Campus Green