News and Events
DGR Engineering is proud to be a part of this Osceola County Rural Water System project.
It consists of the construction of a new 2,400 gpm water treatment plant and a 1.0 million gallon ground storage reservoir. The plant will remove iron and manganese from the groundwater through aeration, detention, and filtration treatment processes. The project also includes constructing two backwash water storage ponds.
The contractor, Grundman Hicks, has spent the last few weeks installing rebar and pouring concrete. They are currently setting wall forms on the north side of the building.
U.S. Senator Chuck Grassley visited DGR Engineering in Rock Rapids as part of his every county tour of Iowa. He was given an introduction to DGR’s work and held a Q&A with employees. Iowa State Representative John Wills was also in attendance.
DGR Engineering was honored to host U.S. Senator Joni Ernst as she continued her 99-county tour of Iowa this week. She took time to learn about our business and answered questions from DGR employees while in Rock Rapids.
Work continues on the Randall Community Water District Pipeline Project, including rural installation of approximately 5.5 miles of 24” PVC pipe and construction of a 3 million gallon tank. Coordination with DOT and the Yankton Sioux Tribe are integral components of this project.
Things are happening at the Sioux Center Middle School!
This DGR project included designing a safer drop off/pick up zone,
as well as new basketball courts and a gaga pit (it’s a place for a
game that is similar to Dodge ball, but only one ball is used),
and storm water detention pond.