Client:
Town of Chancellor, SD
Chancellor, SD
Key Features:
- Three phase project will make infrastructure improvements throughout the community
- Addition of a storm sewer system with new storm water outlet location
- Project funding:
– $600,000 SDDOT Community Access Grant for Main Street
– Grants and loans through SRF programs - While not every street was fully reconstructed, the improvements will include work on each street in town
- Multi-phase project, with multiple funding sources
- Concrete surfacing on Main Street (north two blocks)
- Storm sewer outlet installed with the Phase 1 project will set up drainage for Phase 2 and Phase 3
Key Experience:
- Design and plan preparation
- Construction administration and observation
Infrastructure Improvements
DGR Engineering (DGR) and the Town of Chancellor worked together to plan an infrastructure improvements project. Ultimately, solutions were divided into three project phases. Phase 1 included Main Street and the west half of the community. The Town of Chancellor received funding which included nearly 89% in grants and principal loan forgiveness.
Phase 1 included the beginning of a new storm sewer system. DGR and the Town worked with landowners to acquire the needed land and easements for a new storm sewer outlet. It allowed the storm sewer to be extended across the southern end of town in each of the phases of construction, connecting each of the street’s drainage to a larger diameter storm pipe to improve drainage.
Chancellor was awarded Clean Water and Drinking Water State Revolving Funds for their planned Phase 2 project, which covered the central part of the community. They followed with funding for their Phase 3 project and were successful in securing approximately 85% grant and principal loan forgiveness for both Phase 2 and Phase 3 projects.
Each of the project phases included the replacement of sanitary sewer main and services with PVC pipe, replacement of all sanitary manholes with new concrete manholes, replacement and up-sizing of PVC pipe water main and water services as well as adding additional water services to areas that previously did not have existing water main. New street surfacing was placed after the underground improvements. While Main Street included concrete surfacing on the north two blocks, the remaining streets will maintain a rural section paved with asphalt surfacing. The rural section is designed with minor ditches graded along the roadways and culvert replacement at the driveways and intersections to allow the stormwater to flow to the storm sewer system, located at the southern portions of the streets, to reduce the stormwater ponding that had occurred.
The infrastructure investment will significantly improve and benefit the community and all residents. They are looking forward to project completion and many years ahead with reliable infrastructure to support their Town.
Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Water & Wastewater
Control Systems & Automation
Our team of experts can cater custom SCADA solutions for any size project.
Land Acquisition Services
DGR Engineering offers a “one-stop shop” for planning, designing, permitting, right-of-way and easement acquisition services, and construction administration needs.
Water Treatment Plant Improvement
The improvements delivered a cost‑effective, long‑term solution that enhanced reliability, met regulatory requirements, and advanced system capacity goals.
Northwest Iowa