Key Features:

  • Three phase project will make infrastructure improvements throughout the community
  • Addition of a storm sewer system with new storm water outlet location
  • Project funding:
    – $600,000 SDDOT Community Access Grant for Main Street
    – Grants and loans through SRF programs
  • While not every street was fully reconstructed, the improvements will include work on each street in town
  • Multi-phase project, with multiple funding sourcesConcrete surfacing on Main Street (north two blocks)
  • Storm sewer outlet installed with the Phase 1 project will set up drainage for Phase 2 and Phase 3

Key Experience:

  • Design and plan preparation
  • Construction administration and observation

Infrastructure Improvements

DGR Engineering (DGR) and the Town of Chancellor worked together to plan an infrastructure improvements project. Ultimately, solutions were divided into three project phases. Phase 1 included Main Street and the west half of the community. The Town of Chancellor received funding which included nearly 89% in grants and principal loan forgiveness.

Phase 1 included the beginning of a new storm sewer system. DGR and the Town worked with landowners to acquire the needed land and easements for a new storm sewer outlet. It allowed the storm sewer to be extended across the southern end of town in each of the phases of construction, connecting each of the street’s drainage to a larger diameter storm pipe to improve drainage.
Chancellor was awarded Clean Water and Drinking Water State Revolving Funds for their planned Phase 2 project, which covered the central part of the community. They followed with funding for their Phase 3 project and were successful in securing approximately 85% grant and principal loan forgiveness for both Phase 2 and Phase 3 projects.

Each of the project phases included the replacement of sanitary sewer main and services with PVC pipe, replacement of all sanitary manholes with new concrete manholes, replacement and up-sizing of PVC pipe water main and water services as well as adding additional water services to areas that previously did not have existing water main. New street surfacing was placed after the underground improvements. While Main Street included concrete surfacing on the north two blocks, the remaining streets will maintain a rural section paved with asphalt surfacing. The rural section is designed with minor ditches graded along the roadways and culvert replacement at the driveways and intersections to allow the stormwater to flow to the storm sewer system, located at the southern portions of the streets, to reduce the stormwater ponding that had occurred.

The infrastructure investment will significantly improve and benefit the community and all residents. They are looking forward to project completion and many years ahead with reliable infrastructure to support their Town.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Neighborhood Revitalization

The Southeast Infrastructure Improvements project revitalized the neighborhood by replacing dilapidated infrastructure with new, dependable infrastructure.

Neighborhood Revitalization
Dell Rapids, SD

Infrastructure Improvements

The infrastructure investment will significantly improve and benefit the community and all residents with many years ahead with reliable infrastructure.

Infrastructure Improvements
Chancellor, SD

Water Treatment Plant

The building is expandable to add future treatment equipment that can double the treatment capacity as water demands increase in the future. With three times more water available and enough annual water appropriation to operate at full capacity all year long, the new facility has become Red Rock’s primary water source.

Water Treatment Plant
Jeffers, MN

Water System Improvements

The water tower serves as both a critical piece of Sheldon’s drinking water infrastructure and as a welcome beacon for the City.

Water System Improvements
Sheldon, IA

Drainage Channel Improvements

DGR designed the channel to handle more capacity and protect the area from future flooding, which required making the channel deeper and wider.

Drainage Channel Improvements
Sioux Falls, SD

Athletic Field Site Design

Project planning by Augustana University and DGR Engineering to upgrade Bowden Field to a championship level began in 2018, and eventually culminated in a new facility which opened for the 2023 season.

Athletic Field Site Design
Sioux Falls, SD