Site Development, Utility Improvements

image2

public support for
public safety in alton

Project Owner:
City of Alton, IA

Key Experience:

  • Long term coordination with the City of Alton to plan for the future needs of the area
  • Successful coordination with local contractors
  • Local design partnerships with CMBA and EDA for the building addition project

Key Features:

  • Long-term City planning outlook- 2015 street project, 2022 Fire Station Addition project
  • Community support, $2M bonding bill supported by 97% of voters
  • Local contractors bids add to the community feel

DGR Engineering (DGR) continues to support the City of Alton, IA in planning and design for their long-term infrastructure needs, including a new fire station. As part of that process, a multi-phase plan for infrastructure projects was developed, splitting the project work into two phases to meet budgetary and approval constraints. Phase 1 (2015) involved a street reconstruction project, including updated sanitary sewer and water infrastructure with new road surfacing (PCC). Phase 2 (2021-22) included new (PCC) driveway and sidewalk, grading and building utilities adjacent to the new building addition.

Driveways, sidewalks and utilities for the 11th Street project (2015) were planned while keeping in mind the challenging ADA site for the future fire department expansion project (2021).

To add to the public support sentiment that surrounded this project, both publicly bid projects featured area contractors. The 2015 street project was completed by Jellema Construction of Alton, and the building general contractor was Poppma-Sikma of Sheldon. The design group included DGR as the civil engineering consultant for both projects, while the building addition (2021-22) was designed by CMBA Architects and Engineering Design Associates (EDA) as design partners.
Based on the design, bidding and construction time frames, the building addition project experienced the early effects of recent economic inflation. The City and design team selected project materials and changes as needed to meet the project budget. The project overwhelmingly passed in the bonding vote, including an additional parking paving bid alternate that was not included in the final project.

Challenges
As with most projects, challenges presented themselves throughout the course of the two projects. The primary concern from a site perspective was constructing a single floor elevation building addition adjacent to a roadway with 4' of fall, while maintaining fire truck passable driveway slopes and ADA required sidewalk grades.

The City provided early indication of their future building plans, allowing DGR engineers to design street grades that would meet the municipal street needs and allow for an ADA accessible route to the new community asset.
In the end, successful communication, planning and flexibility culminated in two successful projects for the community of Alton, resulting in a singular infrastructure upgrade.

IMG_9858
IMG_9302

DGR designed a new lift station, new sanitary sewer, water mains and the associated service lines as well as a storm sewer system to collect stormwater. The stormwater was routed to the south end of Rushmore Drive to the sedimentation basin designed as part of the project. The sedimentation basin has a system in place to help collect trash washed from the streets and to contain sediment and oils from the roadway. This allows the City to collect that material and dispose of it, rather than have it carried into Splitrock Creek.

DGR teamed with Confluence to facilitate streetscaping and the sedimentation basin landscaping.

The sedimentation basin was a unique feature to this project. It was designed to slow the discharge of stormwater to Splitrock Creek in smaller rain events, but it also has the ability to be overtopped at the bottom in larger rain events without causing damage to the system.

As the City of Brandon grows, the basin will help to meet upcoming MS4 (Municipal Separate Storm Sewer System) EPA requirements that will be placed on the City.DGR assisted the the City in acquiring the land needed to construct the sedimentation basin and relocate the City’s lift station that serves the area. The decision was made to relocate and construct a new sanitary sewer lift station on the same parcel that would contain the sedimentation basin. The new lift station replaced some aging pumps and equipment, and employees will no longer need to climb down into a confined space. In addition, an on-site back up generator was added to provide instant backup in the event of a power outage.

During construction, DGR provided on-site construction observation to ensure the work complied with the design requirements and to work with residents, answer their questions and address their concerns. Temporary mailboxes were added near the post office for the project and when the project was complete, Cluster Box Units (CBU’s) were installed, eliminating mailboxes at each residence.

Phase II is planned to be constructed in 2023 and Phase III construction is planned for 2025.