Wastewater Treatment Facility

NEW Wastewater Plant
replaces aging infrastructure
Project Owner:
City of Sheldon, IA
Key Experience:
- Maintaining the use of the existing facility during construction of the new one
- Cooperation with existing business and residences that would be affected by the location of the new facility
Key Features:
- New continuous flow sequencing
batch reactor (SBR) wastewater
treatment facility - Pretreatment including mechanical bar screen and non-mechanical grit removal
- UV disinfection
- 5.3 million gallons of waste treated daily
- 1,000 kW backup generator
- Automated systems
- New outfall and discharge location
Sheldon, Iowa is a community of 5,200 people located in the northwest corner of the state. The City’s existing wastewater treatment facility was nearing the end of its useful life and was undersized for the City’s current population. Additionally, a new National Pollution Discharge Elimination System (NPDES) permit required advancements in treatment which the old facility could not provide.
DGR Engineering (DGR) worked jointly with the City to evaluate multiple treatment alternatives which included updating the existing water treatment plant. Ultimately, the selection of sequencing batch reactor (SBR) was made, based on cost, operational flexibility and convenience. The option of modernizing the existing plant was rejected because the cost would have been nearly double that of a new facility.
The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor. It is adequate for future population growth as well as economical development with industrial growth potential.
Start up of the new plant took place in mid-July and old infrastructure is currently being demolished. The $9.5 million construction costs were funded with revenue bonding and tax incremental financing (TIF) and utilized City owned property adjacent to the existing facility. Cooperation with existing businesses and residences affected by the location of the new facility was essential to project success. The facility is expandable for future treatment requirements, and will serve the City’s needs for many years into the future.



Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Wastewater
- Water
Upgrading Communications
DGR engineers helped L&O Power Cooperative improve communications on its electric transmission system using existing transmission lines, fiber and underground fiber line.
Rock Rapids, IA
Treatment Plant & Well Exploration
DGR Engineering worked closely with OCRWS to design a new Water Treatment Plant to target iron and manganese removal from a shallow groundwater source near the site.
Northwest IA
Distribution Conversion
Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.
Redwood Falls, MN
Street & Utility Improvements
Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.
Sioux City, IA
Wastewater Treatment Facility
The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor.
Sheldon, IA
Site Development
Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.
Rock Rapids, IA