Wastewater Treatment Facility

DCIM100MEDIAMAX_0015.JPG

Orange City Prepares for the Future

Addition of mechanical treatment facility meets capacity and compliance

Project Owner:
City of Orange City, IA

Key Features:

  • New flow-through sequencing batch reactor (SBR) wastewater treatment facility
  • Preliminary treatment includes spiral screening and grit removal
  • UV disinfection

The City of Orange City, IA, population approximately 6,000, received an Administrative Consent Order from the Iowa Department of Natural Resources for effluent ammonia violations of their National Pollution Discharge Elimination (NPDES) permit in 2015. The City was required to make improvements to their wastewater treatment plant to bring them into compliance with effluent limits. In turn, the City evaluated treatment options to not only meet existing permit limits, but also to comply with anticipated future limits including provisions for the Iowa Nutrient Reduction Strategy.

DGR Engineering (DGR) worked with the City to evaluate alternatives, which included constructing a sequencing batch reactor (SBR), mixed bed biofilm reactor (MBBR), retention and land application, activated sludge, or submerged attached growth reactor (SAGR).

The evaluation considered capital costs, long-term operation and maintenance costs, operational flexibility and expandability. After consideration and numerous site visits, the City ultimately determined a flow-through style SBR system to be the preferred choice based on the selection criteria and the ability to meet anticipated permit limits.

JCDI8061

Preliminary treatment includes a spiral screen and vortex grit removal system. An ultraviolet (UV) disinfection system was also included to meet effluent disinfection requirements. A full-plant supervisory control and data acquisition (SCADA) system was incorporated in the project for remote monitoring.

The existing facility consisted of a six cell aerated lagoon system which included an industrial pretreatment cell with surface aerators, three aerated cells with diffused air, along with two quiescent cells.

The new system will utilize two of the existing lagoon cells’ flow equalization and sludge storage prior to land application. During peak flow events, the facility can split flow to utilize the dedicated lagoon for equalization and then send back influent wastewater through the plant when flows subside.

The facility was designed to treat a total flow of 2.45 million gallons per day (MGD) to accommodate projected 20-year domestic and industrial growth.

The new facility was designed for an increased population of 6,500. The improvements made the facility easily expandable for future needs and was designed with impending nutrient limits in mind.

Due to the complexity of the new facility, the required operator certification increased from a Grade II to a Grade IV certification. DGR Engineering worked closely with the City and IDNR to determine a pathway for expedited training and certification of existing staff.

Total project cost was $9.9 Million. The City used local bonds for the project costs.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Neighborhood Revitalization

The Southeast Infrastructure Improvements project revitalized the neighborhood by replacing dilapidated infrastructure with new, dependable infrastructure.

Neighborhood Revitalization
Dell Rapids, SD

Infrastructure Improvements

The infrastructure investment will significantly improve and benefit the community and all residents with many years ahead with reliable infrastructure.

Infrastructure Improvements
Chancellor, SD

Water Treatment Plant

The building is expandable to add future treatment equipment that can double the treatment capacity as water demands increase in the future. With three times more water available and enough annual water appropriation to operate at full capacity all year long, the new facility has become Red Rock’s primary water source.

Water Treatment Plant
Jeffers, MN

Water System Improvements

The water tower serves as both a critical piece of Sheldon’s drinking water infrastructure and as a welcome beacon for the City.

Water System Improvements
Sheldon, IA

Drainage Channel Improvements

DGR designed the channel to handle more capacity and protect the area from future flooding, which required making the channel deeper and wider.

Drainage Channel Improvements
Sioux Falls, SD

Athletic Field Site Design

Project planning by Augustana University and DGR Engineering to upgrade Bowden Field to a championship level began in 2018, and eventually culminated in a new facility which opened for the 2023 season.

Athletic Field Site Design
Sioux Falls, SD