Track & Field Facility Improvements

IMG_1015 edit

Coordination with multiple entities leads to successful school district project

Parkston, SD Improves Track and Field Facilities for 2018-2019 Season

Project Owner:
Parkston, SD School District

Key Experience:

  • Full track and field expansion while maintaining existing football field
  • Coordination with owner, architect, contractor
  • Unsuitable sub-grade requiring a specific track section based on soil conditions

Key Features:

  • New facility with 8-lane track, long jump, triple jump, high jump, shot put, discus and pole vault facilities
  • New grandstand with crow’s nest, concession stand and bathrooms
  • Drainage improvements within the track

The Parkston, SD School District wanted to upgrade their facilities to replace existing track, field event areas, and grandstand. DGR Engineering (DGR) teamed up with Puetz Corporation to work with the school district on solutions to meet their needs. DGR designed the track and field layout, and Puetz Corp. planned the grandstand portion of the project.

Lack of proper drainage around the track had led to major cracks and the track’s surface was deteriorating. Soil borings indicated highly saturated and frost susceptible soil conditions underneath the track. Based on information from the geotechnical report and discussions with the architect and school district, the track area was subcut 3’ so suitable drainage fill could be brought in to minimize frost/heave and drainage issues. If not addressed, these issues could ultimately lead to shifting and cracking of the new track surface.

Drainage adjacent to the track was improved to enhance runoff and extend the life of the new track. Track lane markings put the finishing touch on the ½” rubberized mat surface placed over 3.5” of asphalt pavement.

The old facility featured an eight-lane track with 36” wide lanes. The old track and grandstands were removed, and lane width was increased to 42”. With this new wider lane width, Parkston School District will be eligible to host regional meets.

New grandstands were installed, along with all new field event facilities. To accommodate the wider lane widths, the track had to be shifted within the site constraints to maintain the existing football field and light poles and to minimize additional costs to the school district.

IMG_3137
IMG_4550
IMG_3732
IMG_3688
IMG_3553
IMG_1007 edit
IMG_0978 edit

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Neighborhood Revitalization

The Southeast Infrastructure Improvements project revitalized the neighborhood by replacing dilapidated infrastructure with new, dependable infrastructure.

Neighborhood Revitalization
Dell Rapids, SD

Infrastructure Improvements

The infrastructure investment will significantly improve and benefit the community and all residents with many years ahead with reliable infrastructure.

Infrastructure Improvements
Chancellor, SD

Water Treatment Plant

The building is expandable to add future treatment equipment that can double the treatment capacity as water demands increase in the future. With three times more water available and enough annual water appropriation to operate at full capacity all year long, the new facility has become Red Rock’s primary water source.

Water Treatment Plant
Jeffers, MN

Water System Improvements

The water tower serves as both a critical piece of Sheldon’s drinking water infrastructure and as a welcome beacon for the City.

Water System Improvements
Sheldon, IA

Drainage Channel Improvements

DGR designed the channel to handle more capacity and protect the area from future flooding, which required making the channel deeper and wider.

Drainage Channel Improvements
Sioux Falls, SD

Athletic Field Site Design

Project planning by Augustana University and DGR Engineering to upgrade Bowden Field to a championship level began in 2018, and eventually culminated in a new facility which opened for the 2023 season.

Athletic Field Site Design
Sioux Falls, SD