Client:
City of Dell Rapids
Dell Rapids, SD
Key Features:
- Quartzite Bedrock Blasting and Excavation
- Sanitary Sewer and Force Main Improvements
- Asphalt and Gravel Surfacing Replacement
Key Experience:
Lift Station, Control Panel, Valve Vault
The SE Sanitary Sewer Extension project provided sanitary sewer service to a previously un-serviced area southeast of Dell Rapids, SD. A significant portion of the project area was undeveloped with shallow quartzite bedrock which attributed to the lack of utility service provided to this area. Included with this project was a lift station, control panel and valve vault along with the installation of 3,000 feet of sanitary sewer and over 1,000 cubic yards of bedrock excavation. Also included in the project were water main and sanitary force main installation.
DGR Engineering assisted the City in securing funding for the project through preparation of a preliminary engineering report and facilities plan. Preliminary engineering services followed which included field survey and utilities data collection to develop the base plan and profile, as well as analysis for preliminary design and cost estimates for the project. DGR also completed the final design as well as construction plans and specifications for the project. Construction engineering services included bid letting services as well as construction staking, observation, and administration for the project.
Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Wastewater
- Water
New Water Treatment Plant
New Water Treatment Plant delivers higher quality and more economical water.
Osgood, IA
New Water Distribution System
The City’s residents enjoy high quality water that comes to them in a new and reliable distribution system.
Revere, MN
Site Development, Utility Improvements
A multi-phase plan for infrastructure projects was developed for the City of Alton.
Alton, IA
Neighborhood Reconstruction
Health, safety and public welfare were all improved by this project.
Brandon, SD