Client:
Red Rock Rural Water System

Jeffers, MN

Key Features:

  • Designed three production wells capable of supplying 1.4 MGD to the ethanol plant and 9-miles of 10” diameter raw water main to transmit the water from the source to the point of use

Key Experience:

  • Reduced demand on City’s water supply by finding a non-potable source for the ethanol plant
  • Avoided rate increases by eliminating the need for a new RO WTP
  • Teamed up with Red Rock Rural Water System and POET to perform a program of exploratory drilling, test pumping and well field development

Water Source Development

Red Rock Rural Water System was looking at the prospect of a costly rate increase from the City of Windom, who is one of their primary water suppliers.  In addition to meeting their own water needs and selling water to Red Rock, the City of Windom supplies water to the City of Bingham Lake and the nearby POET ethanol plant.  Windom’s water supply was on the decline and they were considering a new water source from a deeper groundwater formation that would require reverse osmosis treatment and a hefty increase in water rates.

DGR Engineering was already working with Red Rock on a constructing a new 1.2 MGD water treatment plant.  During the water source exploration phase of that project a potential source was identified in a shallow alluvial aquifer along the Des Moines River.  The only problem with the site was that it was within a mile of the County landfill, which could be a major problem from a public perception.  However, the bad optics for a drinking water source wasn’t a problem if the source was developed as an industrial water supply.

Looking for a good regional solution to Windom’s water crisis, DGR Engineering and Red Rock Rural Water System teamed up with POET to perform a program of exploratory drilling, test pumping and well field development.  DGR designed three production wells capable of supplying 1.4 MGD to the ethanol plant and 9-miles of 10” diameter raw water main to transmit the water from the source to the point of use.

Red Rock’s out-of-the-box approach to a declining water supply and their long-term relationship with DGR Engineering ended up being a win-win-win situation for everyone.  POET had a new water source with a lower cost of production while keeping Windom as a back-up supply.  POET continues to pay for the debt retirement on their original Windom water source in exchange for an emergency connection.  Red Rock avoided a rate increase on their water purchases from Windom, allowing them to continue to utilize a vital water source for their system. Windom was able to reduce their water use by 1/3 and cancelled their plans for a new RO water treatment plant, saving the residents the cost of a rate increase.  The entire project was Addition by Subtraction.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Site Development

DGR Engineering (DGR) worked with the City and the project architect for all aspects of the project including topographic survey, site design, construction survey, construction observation and administration.

Site Development
Sioux City, Iowa

Sanitary Sewer Rehabilitation

The project was bid and came in under budget. Manhole lids were raised to provide better access in some areas, and rehabilitation of the sewer system was completed to give another 50 years of life to the City’s much-needed infrastructure.

Sanitary Sewer Rehabilitation
Rembrandt, IA

Wastewater Treatment Facility

MBBR technology was chosen based on cost, operational flexibility and most importantly, limited land availability.

Wastewater Treatment Facility
Sanborn, IA

Floodplain Analysis

DGR employed a Geographic Information System (GIS) in conjunction with the U.S. Army Corps of Engineers to first determine the 100-year flood elevations and delineate the floodway boundaries.

Floodplain Analysis
Sutherland, IA

Distribution Conversion

Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.

Distribution Conversion
Redwood Falls, MN

Street & Utility Improvements

Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.

Street & Utility Improvements
Sioux City, IA