Client:
City of Sioux Falls

Sioux Falls, SD

Key Features:

  • 8” water main replacement
  • Directional drilling
  • Asphalt resurfacing

Key Experience:

  • Coordination/cooperation with multiple utilities
  • Working with Businesses to maintain access through construction

Water Main Replacement

This project consisted of water main replacement on St. Paul Avenue from Benson Road to 39th Street North in Sioux Falls, South Dakota.  Work included water main replacement, sanitary manhole repair, replacement of surfacing over trenches, and boulevard restoration.  The water main replacement successfully utilized both open trenching and directional drilling methods.  Sanitary manhole repair included reconstructing manhole benches and inverts along with installing manhole external frame seals.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Neighborhood Revitalization

The Southeast Infrastructure Improvements project revitalized the neighborhood by replacing dilapidated infrastructure with new, dependable infrastructure.

Neighborhood Revitalization
Dell Rapids, SD

Infrastructure Improvements

The infrastructure investment will significantly improve and benefit the community and all residents with many years ahead with reliable infrastructure.

Infrastructure Improvements
Chancellor, SD

Water Treatment Plant

The building is expandable to add future treatment equipment that can double the treatment capacity as water demands increase in the future. With three times more water available and enough annual water appropriation to operate at full capacity all year long, the new facility has become Red Rock’s primary water source.

Water Treatment Plant
Jeffers, MN

Water System Improvements

The water tower serves as both a critical piece of Sheldon’s drinking water infrastructure and as a welcome beacon for the City.

Water System Improvements
Sheldon, IA

Drainage Channel Improvements

DGR designed the channel to handle more capacity and protect the area from future flooding, which required making the channel deeper and wider.

Drainage Channel Improvements
Sioux Falls, SD

Athletic Field Site Design

Project planning by Augustana University and DGR Engineering to upgrade Bowden Field to a championship level began in 2018, and eventually culminated in a new facility which opened for the 2023 season.

Athletic Field Site Design
Sioux Falls, SD