Client:
City of Sioux Falls

Sioux Falls, SD

Key Features:

  • 8” water main distribution
  • Turn lane addition to TJN Enterprises on East Rice Street

Key Experience:

  • Coordination/cooperation with the Sioux Falls Parks Department and Xcel Energy
  • Coordination with railroad for water main installation and access coordination

Water Main Extension

This project consisted of installing 8” water main beginning approximately 1,700 feet southwest of the Great Bear entrance road and continuing 3,700 feet to the northeast.  This project included water main installation, asphalt removal and replacement, and site restoration and grading.  Also included in this project was the grading and paving for a turn lane approximately 600 feet long on Rice Street for the proposed TJN site.