Client:
City of Dell Rapids

Dell Rapids, SD

Key Features:

  • 12” water main distribution line
  • Major drainage improvements
  • Improved intersection geometrics at 15th Street and Clark Avenue
  • 9” concrete pavement

 

Key Experience:

  • SRF Funding through SDDENR
  • Community Access Grant through SDDOT
  • Worked with road excavation depths of 18” to 24” at cemetery entrances requiring access coordination

Street & Utility Improvements

This project consisted of 3,700 L.F. of street improvements on 15th Street from Old Highway 77 to Clark Avenue in Dell Rapids.  Also included in this project were improvements to the water main, sanitary sewer and storm sewer in conjunction with street improvements.  Street paving on 15th Street was with 9″ concrete, with some asphalt concrete paving used on intersecting street tie-ins. ADA accessible sidewalks were also installed on this project for safe access to the new elementary school.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Neighborhood Revitalization

The Southeast Infrastructure Improvements project revitalized the neighborhood by replacing dilapidated infrastructure with new, dependable infrastructure.

Neighborhood Revitalization
Dell Rapids, SD

Infrastructure Improvements

The infrastructure investment will significantly improve and benefit the community and all residents with many years ahead with reliable infrastructure.

Infrastructure Improvements
Chancellor, SD

Water Treatment Plant

The building is expandable to add future treatment equipment that can double the treatment capacity as water demands increase in the future. With three times more water available and enough annual water appropriation to operate at full capacity all year long, the new facility has become Red Rock’s primary water source.

Water Treatment Plant
Jeffers, MN

Water System Improvements

The water tower serves as both a critical piece of Sheldon’s drinking water infrastructure and as a welcome beacon for the City.

Water System Improvements
Sheldon, IA

Drainage Channel Improvements

DGR designed the channel to handle more capacity and protect the area from future flooding, which required making the channel deeper and wider.

Drainage Channel Improvements
Sioux Falls, SD

Athletic Field Site Design

Project planning by Augustana University and DGR Engineering to upgrade Bowden Field to a championship level began in 2018, and eventually culminated in a new facility which opened for the 2023 season.

Athletic Field Site Design
Sioux Falls, SD