Client:
City of Dell Rapids
Dell Rapids, SD
Key Features:
- 12” water main distribution line
- Major drainage improvements
- Improved intersection geometrics at 15th Street and Clark Avenue
- 9” concrete pavement
Key Experience:
- SRF Funding through SDDENR
- Community Access Grant through SDDOT
- Worked with road excavation depths of 18” to 24” at cemetery entrances requiring access coordination
Street & Utility Improvements
This project consisted of 3,700 L.F. of street improvements on 15th Street from Old Highway 77 to Clark Avenue in Dell Rapids. Also included in this project were improvements to the water main, sanitary sewer and storm sewer in conjunction with street improvements. Street paving on 15th Street was with 9″ concrete, with some asphalt concrete paving used on intersecting street tie-ins. ADA accessible sidewalks were also installed on this project for safe access to the new elementary school.
Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Wastewater
- Water
Upgrading Communications
DGR engineers helped L&O Power Cooperative improve communications on its electric transmission system using existing transmission lines, fiber and underground fiber line.
Rock Rapids, IA
Treatment Plant & Well Exploration
DGR Engineering worked closely with OCRWS to design a new Water Treatment Plant to target iron and manganese removal from a shallow groundwater source near the site.
Northwest IA
Distribution Conversion
Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.
Redwood Falls, MN
Street & Utility Improvements
Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.
Sioux City, IA
Wastewater Treatment Facility
The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor.
Sheldon, IA
Site Development
Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.
Rock Rapids, IA