Client:
City of Sioux Falls
Sioux Falls, SD
Key Features:
- Addition of three mainline 13.8 kV distribution circuits
- Circuits were built in underground fashion to increase reliability and improve aesthetics
Key Experience:
- Coordinating with multiple City of Sioux Falls departments, other utilities, and railroad authorities
- Integrating traffic control provisions associated with construction in busy areas
- Responsibility and involvement in all phases of the project
Mainline Distribution Circuits
The project included the construction of three new mainline 13.8 kV circuits on the City’s distribution system to increase capacity and reliability. The circuits were built in underground fashion; two extending from the City’s substation near the airport to the downtown area, and one extending from the City’s substation near the airport to the event center. DGR services for this project included the initial study work, project development, engineering design, permitting, construction administration, and resident construction observation.
Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Wastewater
- Water
Upgrading Communications
DGR engineers helped L&O Power Cooperative improve communications on its electric transmission system using existing transmission lines, fiber and underground fiber line.
Rock Rapids, IA
Treatment Plant & Well Exploration
DGR Engineering worked closely with OCRWS to design a new Water Treatment Plant to target iron and manganese removal from a shallow groundwater source near the site.
Northwest IA
Distribution Conversion
Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.
Redwood Falls, MN
Street & Utility Improvements
Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.
Sioux City, IA
Wastewater Treatment Facility
The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor.
Sheldon, IA
Site Development
Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.
Rock Rapids, IA