Client:
City of Superior

Superior, IA

Key Features:

• Individual septic tank with effluent pumps at each home
• Discharge effluent to City of Estherville 6 miles away
• STEP system design to eliminate need for main lift station

Key Experience:

• Negotiated sewer rates as a bulk customer, with Superior’s rates tied to Estherville residential rates
• Continued operational support to assist new city staff after project completion

Low Pressure Collection System

Analyzed collection system alternatives and treatment alternatives. Designed a septic tank effluent pump (STEP) system for Superior’s residents. The STEP system reduced street surface disturbance and was lower cost than a gravity sewer system. The STEP system also eliminated need for a main lift station and backup generation.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Neighborhood Revitalization

The Southeast Infrastructure Improvements project revitalized the neighborhood by replacing dilapidated infrastructure with new, dependable infrastructure.

Neighborhood Revitalization
Dell Rapids, SD

Infrastructure Improvements

The infrastructure investment will significantly improve and benefit the community and all residents with many years ahead with reliable infrastructure.

Infrastructure Improvements
Chancellor, SD

Water Treatment Plant

The building is expandable to add future treatment equipment that can double the treatment capacity as water demands increase in the future. With three times more water available and enough annual water appropriation to operate at full capacity all year long, the new facility has become Red Rock’s primary water source.

Water Treatment Plant
Jeffers, MN

Water System Improvements

The water tower serves as both a critical piece of Sheldon’s drinking water infrastructure and as a welcome beacon for the City.

Water System Improvements
Sheldon, IA

Drainage Channel Improvements

DGR designed the channel to handle more capacity and protect the area from future flooding, which required making the channel deeper and wider.

Drainage Channel Improvements
Sioux Falls, SD

Athletic Field Site Design

Project planning by Augustana University and DGR Engineering to upgrade Bowden Field to a championship level began in 2018, and eventually culminated in a new facility which opened for the 2023 season.

Athletic Field Site Design
Sioux Falls, SD