Client:
City of Benson

Benson, MN

Key Features:

  • 115 kV, horizontal line post, single pole construction.
  • DGR service for this project included MN local review permitting, assisting in the right-of-way acquisition process, design, construction staking, and construction management.

Key Experience:

  • Working with the BNSF railroad company during the right-of-way process for a transmission line that ran parallel to the railroad tracks.
  • Developing the environmental assessment that was submitted to the State in the permitting process.
  • Working with many different entities during different phases of the project. This included the railroad, other power companies, governmental bodies, surveyors, the local FibroMinn generation facility (coordinating scheduled outages and design), and all Contractors.

Line Tap

The project included full services for a 1.4 mile 115 kV line. The project required coordination with many different entities, including other power companies for coordinating the interconnection, and with a railroad company for right-of-way permitting, which included coordinating an inductive interference study.

DGR services for this project included permitting, coordinating the design survey, design, construction administration, construction staking, and resident project observation.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Floodplain Analysis

DGR employed a Geographic Information System (GIS) in conjunction with the U.S. Army Corps of Engineers to first determine the 100-year flood elevations and delineate the floodway boundaries.

Floodplain Analysis
Sutherland, IA

Distribution Conversion

Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.

Distribution Conversion
Redwood Falls, MN

Street & Utility Improvements

Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.

Street & Utility Improvements
Sioux City, IA

Wastewater Treatment Facility (SBR)

The City ultimately determined a flow-through style SBR system to be the preferred choice based on the selection criteria and the ability to meet anticipated permit limits.

Wastewater Treatment Facility (SBR)
Orange City, IA

Site Development

Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.

Site Development
Rock Rapids, IA

Wastewater Treatment Facility (SBR)

The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor.

Wastewater Treatment Facility (SBR)
Sheldon, IA