Client:
City of Estherville
Estherville, IA
Key Features:
- Replace ground storage reservoir
- Maximize water treatment plant capacity
Key Experience:
- Economical above grade ground storage reservoir design
- Replace below grade ground storage reservoir with above grade ground storage reservoir to avoid ground water and soil contamination
Ground Storage Reservoir
Construction of a bolted steel glass lined tank, foundations, and miscellaneous appurtenant work. Nominal size is 300,000 gallons, 36′ diameter, 38′ high.
The ground storage reservoir is a critical component of the water treatment process, allowing flow equalization between the filtration process and the softening system.
Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Water & Wastewater
Control Systems & Automation
Our team of experts can cater custom SCADA solutions for any size project.
Land Acquisition Services
DGR Engineering offers a “one-stop shop” for planning, designing, permitting, right-of-way and easement acquisition services, and construction administration needs.
Water Treatment Plant Improvement
The improvements delivered a cost‑effective, long‑term solution that enhanced reliability, met regulatory requirements, and advanced system capacity goals.
Northwest Iowa