Client:
Heartland Consumers Power District

Wessington Springs, SD

Key Features:

  • 4 MW Diesel Generation Plant
  • Two 2,000 kW, 4.16 kV generator sets
  • Modifications and additions to existing switchgear
  • Fully automated control system

Key Experience:

  • The Responsibility and involvement in all phases of the project, from project feasibility to final testing and checkout.
  • Coordination of project schedule, construction, and testing with a large transmission project in order to keep the lights on in the City.
  • Design of a fully automated generation control system and interface with the City’s SCADA system.

Generation Addition

The project included full services for the construction of generation additions to an existing substation in stand-alone enclosures. The project was constructed in conjunction with a large transmission project which required careful coordination.  Since the transmission line being constructed was a replacement of the City’s only feed, the generation had to supply power to the City during periods of construction of the new line.

DGR services for this project included environmental permitting, engineering design, material procurement, and construction administration.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Fuel System, Terminal, Hangars

Design and construction services for support facilities at the new Sioux County Regional Airport. 

Fuel System, Terminal, Hangars
Sioux County, IA

New Airport Development

DGR led the design and construction phase engineering for the development of a new $30 million airport. Tasks included all phases of design and construction engineering activities.

New Airport Development
Sioux County, IA

Runway/Taxiway/Electrical Systems

DGR Engineering collaborated with a long-standing airport engineering partner at the Watertown, SD Regional Airport to provide electrical design and construction services for the airport including runway and taxiway lights, lighted signs and airport electrical systems upgrades.

Runway/Taxiway/Electrical Systems
Watertown, SD

Pump Station & Storage Reservoirs

The new Edgerton Pump Station (EPS) was constructed to facilitate bringing purchased water from Lewis & Clark Regional Water System (L&C) to the LPRW system. 

Pump Station & Storage Reservoirs
Edgerton, MN

Sanitary Sewer Rehabilitation

DGR Engineering has experience in sanitary sewer rehabilitation including: CIPP sewer main lining, service line grouting or lining (top hat), structure rehabilitation, and other related techniques.

Sanitary Sewer Rehabilitation
Ellsworth, Balaton & Hendricks, MN

Site Development

DGR performed the boundary and topographic surveying as well as the site design of school building addition as a subconsultant.

Site Development
Rock Rapids, IA