Client:
Willmar Municipal Utilities
Key Features:
- 47 kV Distribution System
- Base Load Coal Power Plant
- 2 Diesel Engine Power Plants
- 69 kV Transmission System
Key Experience:
- Electric System Modeling
- Electric Distribution System Coordination
- Distribution Generation Coordination Integration
Coordination Study
DGR provided a device by device coordination study for the Willmar Municipal Utilities electric distribution system.
Utilizing Milsoft’s Windmil® and Light Table® software we were able to develop a system wide coordination philosophy designed to grow and develop as their system grows.
Utilizing a “zone coordination scheme” we provided recommended settings for relays in each substation as well as proper fuse and VFI selection on the distribution circuits.
The project proved to be challenging on a number of levels, including designing a coordination philosophy flexible enough to handle the activation/deactivation of local system generation.
The distribution coordination project dovetailed into a full 69 kV transmission system loop coordination analysis.
Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Wastewater
- Water
Upgrading Communications
DGR engineers helped L&O Power Cooperative improve communications on its electric transmission system using existing transmission lines, fiber and underground fiber line.
Rock Rapids, IA
Treatment Plant & Well Exploration
DGR Engineering worked closely with OCRWS to design a new Water Treatment Plant to target iron and manganese removal from a shallow groundwater source near the site.
Northwest IA
Distribution Conversion
Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.
Redwood Falls, MN
Street & Utility Improvements
Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.
Sioux City, IA
Wastewater Treatment Facility
The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor.
Sheldon, IA
Site Development
Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.
Rock Rapids, IA