Client:
City of Windom

Windom, MN

Key Features:

  • $2.2 million project, included adjacent property assessments
  • Eleven different project locations
  • Residential and downtown construction
  • Water main, sanitary sewer and storm sewer replacement

Key Experience:

  • Significant construction coordination required including weekly project updates
  • Funding Assessments
  • Significant coordination with local businesses/residents during construction

Street Improvements

In the fall of 2016, the City selected DGR to reconstruct water mains, sanitary and storm sewer and pavement for their 2017 infrastructure project. DGR assisted the City in managing all phases of reconstruction work within the existing community to limit the inconvenience and provide long-term solutions for these project segments.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Site Development

DGR Engineering (DGR) worked with the City and the project architect for all aspects of the project including topographic survey, site design, construction survey, construction observation and administration.

Site Development
Sioux City, Iowa

Sanitary Sewer Rehabilitation

The project was bid and came in under budget. Manhole lids were raised to provide better access in some areas, and rehabilitation of the sewer system was completed to give another 50 years of life to the City’s much-needed infrastructure.

Sanitary Sewer Rehabilitation
Rembrandt, IA

Wastewater Treatment Facility

MBBR technology was chosen based on cost, operational flexibility and most importantly, limited land availability.

Wastewater Treatment Facility
Sanborn, IA

Floodplain Analysis

DGR employed a Geographic Information System (GIS) in conjunction with the U.S. Army Corps of Engineers to first determine the 100-year flood elevations and delineate the floodway boundaries.

Floodplain Analysis
Sutherland, IA

Distribution Conversion

Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.

Distribution Conversion
Redwood Falls, MN

Street & Utility Improvements

Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.

Street & Utility Improvements
Sioux City, IA