Client:
City of Windom

Windom, MN

Key Features:

  • $2.2 million project, included adjacent property assessments
  • Eleven different project locations
  • Residential and downtown construction
  • Water main, sanitary sewer and storm sewer replacement

Key Experience:

  • Significant construction coordination required including weekly project updates
  • Funding Assessments
  • Significant coordination with local businesses/residents during construction

Street Improvements

In the fall of 2016, the City selected DGR to reconstruct water mains, sanitary and storm sewer and pavement for their 2017 infrastructure project. DGR assisted the City in managing all phases of reconstruction work within the existing community to limit the inconvenience and provide long-term solutions for these project segments.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Distribution Conversion

Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.

Distribution Conversion
Redwood Falls, MN

Street & Utility Improvements

Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.

Street & Utility Improvements
Sioux City, IA

Wastewater Treatment Facility (SBR)

The City ultimately determined a flow-through style SBR system to be the preferred choice based on the selection criteria and the ability to meet anticipated permit limits.

Wastewater Treatment Facility (SBR)
Orange City, IA

Site Development

Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.

Site Development
Rock Rapids, IA

Wastewater Treatment Facility (SBR)

The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor.

Wastewater Treatment Facility (SBR)
Sheldon, IA

Lift Station, Control Panel and Valve Vault

The SE Sanitary Sewer Extension project provided sanitary sewer service to a previously un-serviced area southeast of Dell Rapids, SD.

Lift Station, Control Panel and Valve Vault
Dell Rapids, SD