Client:
Hector Municipal Airport

Hector, MN

Key Features:

• Grading
• Runway Safety Area
• Drainage
• Runway maintenance
• Fuel Systems
• Airport electrical systems

Key Experience:

  • Coordination with the watershed district
  • Environmental issues
  • Land acquisition
  • Staging issues

Runway & Taxiway Improvements

Brian Meyer was Team Leader and Project Manager for numerous environmental, planning, design and construction projects, including the $1 million drainage and safety area improvements project.  The project included coordination with the watershed district, environmental, land acquisition, and staging issues.  He worked with the City, agencies and land owners to achieve successful projects.  DGR Engineering also completed a fueling system project and electrical system upgrade in 2017.

Featured Projects

All
  • All
  • Aviation
  • Civil
  • Electrical Power
  • Survey
  • Wastewater
  • Water

Distribution Conversion

Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.

Distribution Conversion
Redwood Falls, MN

Street & Utility Improvements

Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.

Street & Utility Improvements
Sioux City, IA

Wastewater Treatment Facility (SBR)

The City ultimately determined a flow-through style SBR system to be the preferred choice based on the selection criteria and the ability to meet anticipated permit limits.

Wastewater Treatment Facility (SBR)
Orange City, IA

Site Development

Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.

Site Development
Rock Rapids, IA

Wastewater Treatment Facility (SBR)

The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor.

Wastewater Treatment Facility (SBR)
Sheldon, IA

Lift Station, Control Panel and Valve Vault

The SE Sanitary Sewer Extension project provided sanitary sewer service to a previously un-serviced area southeast of Dell Rapids, SD.

Lift Station, Control Panel and Valve Vault
Dell Rapids, SD