Client:
Hector Municipal Airport
Hector, MN
Key Features:
• Grading
• Runway Safety Area
• Drainage
• Runway maintenance
• Fuel Systems
• Airport electrical systems
Key Experience:
- Coordination with the watershed district
- Environmental issues
- Land acquisition
- Staging issues
Runway & Taxiway Improvements
Brian Meyer was Team Leader and Project Manager for numerous environmental, planning, design and construction projects, including the $1 million drainage and safety area improvements project. The project included coordination with the watershed district, environmental, land acquisition, and staging issues. He worked with the City, agencies and land owners to achieve successful projects. DGR Engineering also completed a fueling system project and electrical system upgrade in 2017.
Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Wastewater
- Water
Wastewater Treatment Facility
MBBR technology was chosen based on cost, operational flexibility and most importantly, limited land availability.
Sanborn, IA
Floodplain Analysis
DGR employed a Geographic Information System (GIS) in conjunction with the U.S. Army Corps of Engineers to first determine the 100-year flood elevations and delineate the floodway boundaries.
Sutherland, IA
Distribution Conversion
Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.
Redwood Falls, MN
Street & Utility Improvements
Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.
Sioux City, IA
Wastewater Treatment Facility (SBR)
The City ultimately determined a flow-through style SBR system to be the preferred choice based on the selection criteria and the ability to meet anticipated permit limits.
Orange City, IA
Site Development
Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.
Rock Rapids, IA