Client:
Sioux Center Community Hospital & Health Center
Sioux Center, IA
Key Features:
- New Hospital Facility
- Heliport
- Permanent Retention Pond & Stream Restoration
- Mobile MRI Bay
Key Experience:
- Project Coordination with architect, ownership group, general contractor and subcontractors
- Communication with project stakeholders
- Working with USDA Funded project
Hospital Site Development
Sioux Center Community Hospital relocated their hospital facility, which required the completion of several smaller projects in conjunction with the overall hospital construction project.
The new hospital facility design included City utility connections, accounting for the increased traffic on the local road system, mass excavation to accommodate the side hill construction and walk-out basement, a storm water study to analyze the adjacent natural drainage creek, a new helipad facility, a decorative garden overlooking the retention pond, as well as a mobile MRI parking bay. The facility opened in the spring of 2014.
Featured Projects
- All
- Aviation
- Civil
- Electrical Power
- Survey
- Wastewater
- Water
Upgrading Communications
DGR engineers helped L&O Power Cooperative improve communications on its electric transmission system using existing transmission lines, fiber and underground fiber line.
Rock Rapids, IA
Treatment Plant & Well Exploration
DGR Engineering worked closely with OCRWS to design a new Water Treatment Plant to target iron and manganese removal from a shallow groundwater source near the site.
Northwest IA
Distribution Conversion
Due to concerns with the age and condition of the structures, along with safety clearances to energized equipment and conductors, a project was undertaken to replace the old infrastructure with new underground lines and associated padmount equipment.
Redwood Falls, MN
Street & Utility Improvements
Morningside Avenue was reconstructed totaling approximately 1,300 linear feet. The project included new sanitary sewer, water main, storm sewer, fiber conduits, decorative street lighting, and 9-inch concrete paving with colored concrete sidewalks.
Sioux City, IA
Wastewater Treatment Facility
The new plant, rated for 5.3 million gallons per day (MGD) peak day, doubles the capacity of its predecessor.
Sheldon, IA
Site Development
Planning started with site plan design for the new facility to offer maximum exposure to traffic on Highway 75.
Rock Rapids, IA